Hybrid Solar + Storage
Hybrid Industrial

Hybrid Solar + Storage

1.5 MW solar array with battery storage hybrid system for an industrial client.

Location

Bangkok, Thailand

Capacity

1.5 MW + Storage

Commissioned

Expected May 2026

Client

Bangkok Industrial Park

The Challenge

"Unreliable grid and high peak demand required seamless islanding capability."

Our EPC Solution

Lithium-iron-phosphate BESS integrated with hybrid inverters for microgrid operation during outages.

Project Detail Project Detail

Key Performance Metrics

2.3 GWh

Projected Annual Yield

2 MWh

Storage Capacity

8+ Hours

Outage Resilience