Hybrid Solar + Storage
1.5 MW solar array with battery storage hybrid system for an industrial client.
Location
Bangkok, Thailand
Capacity
1.5 MW + Storage
Commissioned
Expected May 2026
Client
Bangkok Industrial Park
The Challenge
"Unreliable grid and high peak demand required seamless islanding capability."
Our EPC Solution
Lithium-iron-phosphate BESS integrated with hybrid inverters for microgrid operation during outages.
Key Performance Metrics
2.3 GWh
Projected Annual Yield
2 MWh
Storage Capacity
8+ Hours
Outage Resilience